Scroll down for the timeline of the layout.

finger  point down color

 I do have two very tight curves as I made them for the Bachmann engines.  The MMI engines will make it after some fancy rework of the pilot and rear trucks. This picture shows the main line on the bottom. the Logging layout is on the upper level. The larger equipment cannot go there.

Handlaid code 100 track  with all new handmade turnouts and reconfigure of the Yard.

new102
finger  point down color

The Great Railroad Add-on has started.

The back wall was cut thru and the layout chopped in half and extended another 12’. This makes a total  depth of the layout 30’.

An addition of a bigger yard is now possible.  

The logging part of the MR&L has changed its route also.  This means more room for another town and logging mill.

new502
new202

From the back of the layout to the front door.

Here will be one large trestle on the main line and a smaller one adjacent on the logging route.

February 2013

finger  point down color
layout_new202
layout_new102

Starting the scenery.  A large sandstone hill in the center with two tunnels and a cut on the side.  Here it looks  worse than it really is.

March 2013

desert7
desert11

Starting  the mine area  and planning the uphill for the logging are yet to come.

April 2013

16mrl.
19mrl.
finger  point down color

The base for the mine is in and finishing up the track layment up and down from there.

May 2013

ceiling

Finally the suspended ceiling is in place.

 PAGE 2

finger  point down color
ceiling1

And new ceiling over the back of the layout and work bench area.

.

.